CHINA | 

Chengdu Engineering Corporation Limited has 40 projects with the total installed capacity of 38,000MW, that are in the feasibility study stage, 38 projects with the total installed capacity of 40,000MW, which are under construction and 120 as-built projects with the total installed capacity of 20,000MW..

Taipingyi Hydropower Station


Taipingyi HPP is located in Sichuan, China, with an installed capacity of 260MW, tunnel length of 10.6km, water head of 108m.
Scope of Work: Reconnaissance & Survey, Feasibility Study, Engineering, Construction Supervision.

Futang Hydropower Station


Futang HPP is located in Sichuan, China, with an installed capacity of 360MW, tunnel length of 19.3km, water head of 187m.